High pressure gas pipeline diversion project to facilitate the improvement and widening of the A1 Birtley to Coal House carriageway
The transition to a low carbon energy sector in the UK presents Gas Distribution Networks (GDNs) with a number of challenges, including reducing the Business Carbon Footprint (BCF) of operating gas networks. The requirement for GDNs to preheat gas at pressure
reduction stations (PRS) to avoid freezing the outlet pipework and ensure continuity of supply
Installation of fiscal metering solutions across a number of strategic gas offtakes
Construction of a new pressure reduction station